翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

M50 motorway (Republic of Ireland) : ウィキペディア英語版
M50 motorway (Ireland)

The M50 motorway ((アイルランド語:Mótarbhealach M50)) is a C-shaped orbital motorway in Dublin and the busiest motorway in Ireland. The current route was built in various sections over the course of 27 years, from 1983 to 2010. It begins at Dublin Port, running northward through the Dublin Port Tunnel and along a portion of the Airport Motorway. It then turns west at its junction with the M1, circling the northern, western and southern suburbs of Dublin, before merging with the M11 at Shankill in South East Dublin. The road forms part of European route E01.
An orbital motorway for Dublin was first proposed in the Dublin Transportation Study of 1971. Construction began on the first section, the Western Parkway (J6-J11) in 1987, and opened to traffic in 1990. This was followed by the Northern Cross Route (J3-J6) in 1996, the Southern Cross Route (J11-J13) in 2001, and the Southeastern Motorway (J13-J17) in 2005. The M50 route was extended to Dublin Port in 2006, via a section of the 1985 Airport Motorway (up to then a part of the M1) and the newly opened Dublin Port Tunnel.
A massive upgrade project commenced in early 2006 due to the motorway's chronic capacity problems. Lanes were added between J3-J13, and many of the low-capacity roundabout interchanges were replaced with free-flowing interchanges. These upgrades were completed in 2010.
==Layout==

The M50 was originally planned to divert traffic travelling on National Primary Routes away from the city (a full bypass of Dublin). Due to urban expansion it now runs through Dublin's suburbs and serves a route for Dublin itself, connecting the suburbs.
All of the National Primary Routes leaving Dublin have junctions with the M50. The junctions were originally in the form of grade-separated signal-controlled roundabout junctions, not free-flowing interchanges. The M50 mainline itself was free-flow through all junctions. The other primary routes served are the N2 to Derry/Monaghan, N3 to Navan/Cavan/Northwest, N4/M4 to Galway/Sligo/Mayo, N7/M7 (M8) to Cork/Limerick/Waterford, and the N11/M11 to Wexford. Additional junctions along the motorway serve other suburbs of Dublin such as Ballymun, Tallaght, Naas, Dundrum, Sandyford and Cherrywood.
Most of these interchanges were subject to high levels of traffic congestion, as was the former toll-plaza north of the West-Link bridge. The busier roundabout junctions were signal-controlled, with tailbacks extending for several kilometres at rush hour. The most infamous was the Red Cow roundabout junction with the N7, formerly dubbed the "Mad Cow Roundabout". As well as being the junction of two of the busiest roads in the State, the Luas tram Red Line from Tallaght to the city centre used to cross two slip roads at-grade, before continuing city-bound in the median of the R110 (formerly N7). As part of the M50 upgrade works (see below), these at-grade crossings were removed, and on December 2008, the completely reconstructed interchange was open. This greatly reduced the congestion at the once-notorious traffic black-spot.
The roundabout at the N3 is also notable as the Royal Canal and the Dublin-Sligo railway line pass through its centre.
The original speed limit on the M50 was 70 mph (112 km/h). The Southern Cross Route from J12-J13 was given a lower limit of 60 mph (96 km/h), due to its more undulating, twisting route. The route from J3-J13 was changed to 100 km/h after the Republic of Ireland's speed limits became metric in 2005, while the Southeastern Motorway section (J13-J17) became 120 km/h. The Airport Motorway-Port Tunnel section of the route from J1-J3 has a speed limit of 80 km/h due to the closely packed junctions and heavy volume of weaving traffic.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「M50 motorway (Ireland)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.